Skip to main content
Download PDF
- Main
R&D Requirements, RF Gun Mode Studies, FEL-2 Steady-State Studies, Preliminary FEL-1
Time-Dependent Studies, and Preliminary Layout Option Investigation
Abstract
This report constitutes the third deliverable of LBNL s contracted role in the FERMI @ Elettra Technical Optimization study. It describes proposed R&D activities for the baseline design of the Technical Optimization Study, initial studies of the RF gun mode-coupling and potential effects on beam dynamics, steady-state studies of FEL-2 performance to 10 nm, preliminary studies of time-dependentFEL-1 performance using electron bunch distribution from the start-to-end studies, and a preliminary investigation of a configuration with FEL s inclined at a small angle from the line of the linac.
Main Content
For improved accessibility of PDF content, download the file to your device.
Enter the password to open this PDF file:
File name:
-
File size:
-
Title:
-
Author:
-
Subject:
-
Keywords:
-
Creation Date:
-
Modification Date:
-
Creator:
-
PDF Producer:
-
PDF Version:
-
Page Count:
-
Page Size:
-
Fast Web View:
-
Preparing document for printing…
0%