Electric Grid
Parent: California Institute for Energy and Environment (CIEE)
eScholarship stats: History by Item for May through August, 2024
Item | Title | Total requests | 2024-08 | 2024-07 | 2024-06 | 2024-05 |
---|---|---|---|---|---|---|
02c6h0sm | WECC Wind Generator Development | 268 | 64 | 45 | 64 | 95 |
4z76h1cn | Oscillation Detection and Analysis | 100 | 37 | 28 | 16 | 19 |
09s3h0t6 | Zenergy Power Corporate Fact Sheet | 91 | 36 | 31 | 16 | 8 |
3q9849pc | Electric Distribution System Simulation and Analysis Tools: Status and Research Gaps for Integration of Renewables and Electric Vehicles | 91 | 17 | 36 | 14 | 24 |
1s88n8c6 | White Paper: The EcoBlock Project and the “Own Use” Exemption under Public Utilities Code Section 218 – A Way Forward for Privately Operated Microgrids | 80 | 23 | 20 | 13 | 24 |
5bk6h3pq | Distribution Monitoring for Renewables Integration | 78 | 30 | 23 | 16 | 9 |
9b17c397 | EcoBlock: Grid Impacts, Scaling, and Resilience | 70 | 25 | 19 | 11 | 15 |
2267w31c | Number and propagation of line outages in cascading events in electric power transmission systems | 66 | 21 | 22 | 16 | 7 |
9hz5h2sd | An Assessment of PIER Electric Grid Research 2003-2014 White Paper | 63 | 9 | 17 | 21 | 16 |
6qr3506h | Wind Power Plant Equivalencing | 61 | 29 | 15 | 10 | 7 |
5rg792nq | 2020 Strategic Analysis of Energy Storage Technology | 58 | 23 | 20 | 3 | 12 |
19z9r8v8 | Real Time Grid Reliability Management 2005 (including appendices) | 56 | 26 | 25 | 1 | 4 |
7j20759s | Electricity Price Communication in California and Beyond | 56 | 14 | 24 | 9 | 9 |
4nz3q892 | Open-Source, Open-Architecture SoftwarePlatform for Plug-InElectric Vehicle SmartCharging in California | 51 | 12 | 19 | 6 | 14 |
99k3736h | WECC Wind Power Plant Power Flow Modeling Guide | 49 | 25 | 18 | 2 | 4 |
9t47p1xc | Resonance of a Distribution Feeder with a Saturable Core Fault Current Limiter | 48 | 20 | 17 | 8 | 3 |
11n0s5cb | Phasor-Based Control for Scalable Solar PV Integration | 45 | 19 | 16 | 4 | 6 |
0c9300d8 | Modeling and Test Validation of a 15kV 24MVA Superconducting Fault Current Limiter | 42 | 20 | 14 | 4 | 4 |
0nb0d684 | Harmonic Interactions of Multiple Distributed Energy Resources in Power Distribution Networks | 42 | 18 | 13 | 2 | 9 |
3pr6506b | Excerpt from Edison Electric Institute Webinars: "Current State of the Electric Distribution System" and Future of the U.S. Distribution System" | 41 | 26 | 11 | 3 | 1 |
73z7b73w | Phasor Measurement Application Study | 41 | 12 | 13 | 3 | 13 |
38w5f5hr | Wind Power Plant Data Collection | 39 | 19 | 15 | 2 | 3 |
3gq8k921 | Tech Transfer Report - CIEE | 39 | 17 | 15 | 3 | 4 |
04x3s4wb | Transmission Probabilistic Congestion Forecasting | 38 | 21 | 8 | 4 | 5 |
57m8m9pc | Real Time Grid Reliability Management 2005 (without appendices) | 38 | 17 | 17 | 3 | 1 |
38b6k2sr | Challenges to the Integration of Renewable Resources at High System Penetration | 37 | 14 | 15 | 3 | 5 |
54d8s799 | WECC Wind Generator Development (including appendices) | 37 | 7 | 16 | 4 | 10 |
81x1c1t5 | Challenges to the Integration of Renewable Resources at High System Penetration | 37 | 14 | 6 | 5 | 12 |
8wx1x1bf | Real-time Voltage Security Assessment: Summary Report | 37 | 22 | 13 | 2 | |
6fx62242 | Real Time System Operations 2006-2007 | 36 | 23 | 11 | 2 | |
1pt5x93f | Real Time System Operation 2006-2007 | 35 | 17 | 15 | 2 | 1 |
51b6n7db | Micro-Synchrophasors: A Promising New Measurement Technology for the AC Grid | 34 | 19 | 12 | 1 | 2 |
29q10723 | Strategic Analysis of Energy Storage Technology Fact Sheet | 33 | 17 | 14 | 1 | 1 |
59t3379f | Transmission Benefit Quantification, Cost Allocation and Cost Recovery | 33 | 13 | 18 | 1 | 1 |
18r0f1f7 | Critical Operating Constraints Forecasting for California Independent System Operator (CAISO) Decision Support | 32 | 12 | 14 | 3 | 3 |
47j0n7mh | Multi-Area Real-Time Transmission Line Rating Study | 32 | 15 | 11 | 4 | 2 |
5c99w5pd | Phasor-Based Assessment for Harmonic Sources in Distribution Networks | 32 | 8 | 12 | 4 | 8 |
6903h1qn | Transmission Technology Research for Renewable Integration | 32 | 11 | 15 | 2 | 4 |
2kx7v247 | Real-Time Dynamic Monitoring System (RTDMS) CA ISO Training Session | 30 | 13 | 12 | 1 | 4 |
9mh8t1bx | Toward Micro-Synchrophasors (μPMUs) for Distribution Networks | 30 | 17 | 10 | 2 | 1 |
6d002396 | Day Ahead Regulation Tool Fact Sheet | 29 | 15 | 12 | 1 | 1 |
6hq9f26b | The Impact of Distributed Generation on Power Transmission Grid Dynamics | 29 | 5 | 13 | 6 | 5 |
8b98128b | Plausible Futures for Electric Grid Architecture - A Scenario Planning Exercise | 28 | 15 | 12 | 1 | |
8h46n8c9 | Application of Advanced Early Warning Systems with Adaptive Protection | 28 | 7 | 10 | 7 | 4 |
54j8x52w | Extreme Events Phase 2 | 27 | 15 | 9 | 1 | 2 |
5xq234kd | Integrating Renewable Generation with the Electricity Grid: Distribution System Issues | 27 | 6 | 9 | 7 | 5 |
08s64656 | Grid Futures through Scenario Planning | 26 | 13 | 11 | 1 | 1 |
32w0b604 | Model Validation of Wind Turbine Generator | 25 | 12 | 8 | 4 | 1 |
3zp693d9 | Real-time Voltage Security Assessment: Report on Algorithms and Framework | 25 | 11 | 12 | 2 | |
4z8238p5 | Feasibility Assessment and Research Results Report | 25 | 12 | 9 | 2 | 2 |
Disclaimer: due to the evolving nature of the web traffic we receive and the methods we use to collate it, the data presented here should be considered approximate and subject to revision.