Skip to main content
eScholarship
Open Access Publications from the University of California

Technical design aspects of Feasibility Study-II

Abstract

Feasibility Study-II examined a high-performance Neutrino Factory providing 1 x 1020 neutrinos per year aimed at a long-baseline detector. The Study was sponsored jointly by BNL and the Neutrino Factory and Muon Collider Collaboration ration (MC) and is based on a 1 MW proton driver operating at 24 GeV, i.e., an upgraded version of the AGS accelerator. Compared with the earlier FNAL-sponsored study (Feasibility Study-I), there is a sixfold improvement in performance. Here we describe details of the implementation of Study-II concepts and discuss their efficacy. Alternative approaches that will be pursued in follow-on R & D activities are also described briefly.

Main Content
For improved accessibility of PDF content, download the file to your device.
Current View