Skip to main content
eScholarship
Open Access Publications from the University of California

Road Ecology Center

Recent Work bannerUC Davis

Joppa preserve – wetland and wildlife habitat restoration

Abstract

Joppa Preserve is a representative piece of a greater Trinity River, bottomland hardwood forest that once dominated this portion of North Texas. Located in Dallas County, the existing core (327 acres) of the project is located downstream of the Dallas Floodway, a flood damage reduction project completed in 1959. As the project sponsors, Dallas County and the U.S. Army Corps of Engineers (USACE) initiated a feasibility study with project implementation costs estimated at $12,000,000. This study is intended to identify existing natural resources, environmental constraints, and develop a restoration plan for Joppa Preserve. Objectives of this feasibility study included identifying the environmental degradation resulting from previous construction and restoration of Joppa Preserve. Water resources within Joppa Preserve include Lemmon Lake, Little Lemmon Lake, Honey Springs, and an unnamed tributary of Five Mile Creek. This feasibility study identified measures designed to restore critical ecosystem components. Potential ecosystem restoration alternatives included restoration and expansion of wetlands and habitat improvements to existing riparian forests. The most critical hydraulic need included the repair of a large earthen embankment isolating Lemmon Lake from the Trinity River. Numerous field surveys were conducted by personnel of U.S. Fish and Wildlife Service (USFWS) and Wendy Lopez and Associates, Inc. (WLA) to detail existing conditions and define natural resources within the project area, evaluate potential ecosystem restoration opportunities, and identify any constraints that might limit the implementation of future ecosystem restoration measures. Several coordination and workgroup meetings were undertaken with USACE, USFWS, Dallas County, City of Dallas, and WLA, to refine these critical steps in the plan formulation process. Through the use of IWR-PLAN software, WLA completed an Incremental Cost Analysis (ICA) in which multiple alternatives were evaluated in a habitat improvement process. USFWS and WLA modeled wildlife utilization by employing the Habitat Evaluation Procedure (HEP). Possible combinations and solutions were identified and represented the best financial investments through the life of the project. Alternatives included: lake embankment restoration, expanding the boundaries of Joppa Preserve, wetland creation, aquatic habitat improvements to Little Lemmon Lake, maintenance of water levels, restoration of a poison ivy parkland, repair of the water outfall control structure, reforestation, and a recreation plan. The plan of interest derived from this process included acquiring additional buffer areas for Joppa Preserve, improving the lakes complex, restoring 15 acres of grassland/woodland, removing existing and creating new water control structures, reforestation of 3 acres of bottomland hardwood habitat, acquiring 69.5 acres of disclimax communities, and restoring 1500 linear feet of the lake embankment.

Main Content
For improved accessibility of PDF content, download the file to your device.
Current View