Graduate student research papers
Parent: River-Lab
eScholarship stats: History by Item for April through July, 2024
Item | Title | Total requests | 2024-07 | 2024-06 | 2024-05 | 2024-04 |
---|---|---|---|---|---|---|
7p58d86h | Tracing the Alhambra Wash: Past, Present, and Future | 143 | 37 | 47 | 38 | 21 |
5fr6w243 | Water Pollution Resulting from Homeless Encampments in Creeks: Programs in Sacramento, Santa Cruz, and San Pablo | 80 | 13 | 15 | 26 | 26 |
64n4h2b1 | Restoring San Leandro/Lisjan Creek: Re-establishing Sacred Relationships as Pathways toward Decolonization | 46 | 7 | 11 | 13 | 15 |
48g539f9 | A Restoration on Yongding River, Beijing | 38 | 2 | 8 | 6 | 22 |
4bq0x7wg | A Critique of the Comprehensive Everglades Restoration Plan | 37 | 12 | 8 | 5 | 12 |
52t0s7d3 | Salinas River: Historical context, maintenance, and biodiversity | 35 | 12 | 6 | 7 | 10 |
9wz3b40v | A Social Analysis of the San Marcos River | 33 | 18 | 2 | 6 | 7 |
0qh9858p | Carbon sequestration potential on a reconnected floodplain: insights from the CosumnesRiver, California | 28 | 8 | 6 | 6 | 8 |
4h61h6p3 | Addressing channel incision through floodplain reconnection: Revisiting the Lower Tassajara Creek project | 27 | 17 | 5 | 3 | 2 |
6974k786 | Tassajara Creek, Twenty Years Later: Long-term riparian vegetation restoration monitoring using field surveys and remote sensing | 25 | 15 | 3 | 4 | 3 |
0h704176 | Flow Regime, Geomorphology, and Debris Transport of the San Pedro River: An Exploration of Flood History and Monitoring at the Border Wall | 24 | 18 | 1 | 2 | 3 |
8t28s24r | A Feasibility Study of the Hangzhou Tangxi Canal Restoration | 24 | 13 | 4 | 4 | 3 |
4jw3z4m3 | Sausal Creek Restoration at Dimond Park: Vegetation and Geomorphology Post-Project Appraisal | 21 | 12 | 1 | 3 | 5 |
6hh170jm | Geomorphic and Hydraulic Controls on Coho Salmon Outmigration in the Russian River Watershed, California | 21 | 10 | 4 | 3 | 4 |
4c91k70d | Riparian vegetated buffer in Chinese urban wetlands: a case study of Xixi wetland, Hangzhou | 20 | 12 | 2 | 4 | 2 |
5hz970wv | Assessment of Channel Changes Three Years after Implementation of the Salmon Habitat Enhancement, Phase 1 on Redwood Creek at Muir Woods | 20 | 13 | 3 | 4 | |
240624t9 | Redwood Creek Restoration at the Banducci Site: Geomorphic Changes on Lower Redwood Creek from 2003 to 2022 | 19 | 11 | 3 | 3 | 2 |
96n8m5kr | A Royal Flush? Ecological and Social Success of Urban River Restoration on the Truckee | 19 | 12 | 2 | 3 | 2 |
2cm1410t | Floodplain Restoration at the Old Orick Mill Site | 18 | 11 | 1 | 2 | 4 |
4993f4t2 | Understanding the water, understanding the canyon: establishing a baseline study of the Redwood Canyon reach of Cerrito Creek in Blake Garden | 17 | 4 | 4 | 4 | 5 |
6mj3b3hn | Creation of a side channel increases habitat heterogeneity in Lagunitas Creek, Marin County, California | 17 | 12 | 2 | 3 | |
3sr4n04k | Assessment of the use of grade control for improved groundwater storage on a tributary in Muir Woods | 16 | 9 | 3 | 4 | |
4r07n0d2 | The Urban Gauntlet for Steelhead Trout: A Reconnaissance Study of Habitat in UpperBollinger and Little Pine Creeks, Contra Costa County | 16 | 2 | 2 | 8 | 4 |
6351w44d | Baxter Creek Gateway Park Restoration: A Post-Project Appraisal | 16 | 10 | 1 | 4 | 1 |
6nw9b03w | Ecological History of Los Laureles-Goat Canyon | 16 | 11 | 1 | 2 | 2 |
3v19383c | The Social Life of a Creek: San Anselmo Creek Park Redesign | 15 | 11 | 3 | 1 | |
7cc357ww | The Social Evaluation of the Interval River ofShanghai Houtan Wetland Park | 15 | 8 | 2 | 2 | 3 |
7d93z6gb | Flood Risk Management and the Levee Effect in West Sacramento, California | 15 | 6 | 2 | 3 | 4 |
8vg720r4 | Finding a Foothold on an Uncertain Bank: An Assessment of Cerrito Creek into the Blake Garden | 15 | 10 | 2 | 2 | 1 |
91p6s6w6 | Fire and Water: Establishing a Geomorphic Baseline for a Perennial Stream in the Walbridge Fire Footprint | 15 | 8 | 1 | 4 | 2 |
9sw8v3ch | Post-Project Appraisal of Arroyo Viejo Improvement Project, Oakland, California | 14 | 10 | 1 | 1 | 2 |
85g0b2nk | Case Study: Pond and Plug Restoration at the Perazzo Meadows in the Northern Sierra Nevadas | 13 | 6 | 3 | 3 | 1 |
16s6r37p | Comparing Vermont and Washington Erodible River Corridor Policies | 12 | 5 | 2 | 4 | 1 |
0j07z3gt | An Assessment of Lower American River Restoration Projects: Energy, Carbon Emissions and Bed Stresses | 11 | 8 | 1 | 2 | |
17s7q641 | Ecological Appraisal of an Urban Creek Daylighting Project: Wildcat Creek at Davis Park | 10 | 5 | 1 | 1 | 3 |
2ww7f0bq | The impact of water level fluctuation on vegetation:An assessment of Zhenjiang Section of Yangtze River | 9 | 2 | 2 | 2 | 3 |
3wf9r44c | Post-Project Appraisal of Santa Rosa Creek Restoration | 9 | 3 | 1 | 3 | 2 |
4qc6v8gh | Post-Occupancy Evaluation Affected by Seasons: A Case Study of Waterfront Green Belt Along Yitong River in Changchun City | 9 | 3 | 2 | 3 | 1 |
0jp223fh | What's Past is Present: A Re-Evaluation of Cerrito Creek | 8 | 6 | 1 | 1 | |
5t75j8x1 | Persistence and Effectiveness of Livewood as Large Wood in River Restoration | 7 | 3 | 1 | 3 |
Disclaimer: due to the evolving nature of the web traffic we receive and the methods we use to collate it, the data presented here should be considered approximate and subject to revision.