Skip to main content
Download PDF
- Main
Dynamic Wireless Charging Lanes for Electric Drayage Trucks
Published Web Location
https://doi.org/10.7922/G2SJ1HZ3Abstract
To better understand DWCL applications in California, we developed a hypothetical case study of DWCL deployment for drayage trucks on a highway network of more than 1,000 miles around the Greater Los Angeles area, home to two of the world’s busiest seaports, the Port of Los Angeles and the Port of Long Beach. We identified optimal locations for DWCLs to serve drayage trucks efficiently along with consideration of suitable grid connection and upgrades of existing power grid to meet heightened energy demand.
Main Content
For improved accessibility of PDF content, download the file to your device.
Enter the password to open this PDF file:
File name:
-
File size:
-
Title:
-
Author:
-
Subject:
-
Keywords:
-
Creation Date:
-
Modification Date:
-
Creator:
-
PDF Producer:
-
PDF Version:
-
Page Count:
-
Page Size:
-
Fast Web View:
-
Preparing document for printing…
0%