Fabrication and Assembly Performance of the First 4.2 m MQXFA Magnet and Mechanical Model for the Hi-Lumi LHC Upgrade

Published Web Location

http://10.0.4.85/tasc.2018.2799563
No data is associated with this publication.
Abstract

The LHC accelerator research program (LARP), in collaboration with CERN and under the scope of the high luminosity upgrade of the Large Hadron Collider, is in the prototyping stage in the development of a 150 mm aperture high-field Nb3Sn quadrupole magnet called MQXF. This magnet is mechanically supported using a shell-based support structure, which has been extensively demonstrated on several R&D models within LARP, as well as in the more recent short (1.2 m magnetic length) MQXF model program. The MQXFA magnets are each 4.2 m magnetic length, and the first mechanical long model, MQXFA1M (using aluminum surrogate coils), and MQXFAP1 prototype magnet (the first prototype with Nb3Sn coils) have been assembled at the LBNL. In this paper, we summarize the tooling and the assembly processes, and discuss the mechanical performance of these first two assemblies, comparing strain gauge data with finite element model analysis, as well as the near-term plans for the long MQXF magnet program.

Item not freely available? Link broken?
Report a problem accessing this item